Bio – composting is cycle of 45 days as follows:
1st to 5th day: Collection/Hauling of materials, Formation of Windrows and trimming 1st pass of Homogenizing machine to reduce the moisture content of press mud to 50%.
Inoculation of Bio-Culture, to stimulate the microbial activity and stops the development of order at the ratio of 1 kg per 1 MT of press mud.
II nd pass of homogenizing machine every day.
6th to 40th day: Maintenance of moisture between 50% to 60% w/w through spraying of distillery spentwash, temperature rises from 40°C – 70°C at the peak of composting process.
Spraying of 80 to 100 ltrs of spentwash per MT of press mud, twice a day along with homogenizing the windrow, using homogenizing machine. Repeat the process for 35 days.
41 to 45th day: Curing, Aging and Drying.
Distillery spentwash spraying application is stopped at the end of 40th day compost is allowed to cure and age, until moisture stabilizes at 30%.
46th day onwards: Disposal of organic manure to farmers after enrichment programme.
Distillation Process |
||||||||||||||||
| We offer separation technologies with higher efficient multiple distillation column systems. Which operate at lower energy consumption, Higher yield. | ||||||||||||||||
|
||||||||||||||||